Today I arranged a big lorry of sand for the working site. After it was delivered I paid for it, this morning at 9 a.m. The staff workers do their best, the work continues, and hopefully from September even more staff people will join there.
Now they are fixing the wood beams for the ceiling. The floor concreting they will do locally with the mixer. They do not hire any tool to break the exisiting concrete on the floor as they are doing it manually. It is more difficult but not impossible.
They want a to fix later on a big window as we discussed and also a smaller window oposite site just above the existing door. The door will be filled with bricks.
The rubbish area, now.
Informed the head nurse, again, that no more money will come until we hear from Dr. Grigoriu.
3 comments:
Wow the rubbish area looks better.
Glad the work is going ok on the old building too.
Thanks for the updates, great to see photos.
Vanessa
How on earth do they get the bins out to empty them?
Good question. Next time I go I will check it more in details. I think that there is a bigger gate what they can open. Perhaps.