Yesterday evening with the roof contractor

This would be the "famous" 3 star accommodation
The contractor measuring the roof
                                              An angel watching over...

Got a new contractor out in Mina, checking the roof. He is based in Vulcan and he came with one of his employees. Been in the flat, in the balcony and in the attic, took all the measurements and got the quotation, we have been expecting.
So we have now the second quotation for the roof. I can say that is quite high.

11 May 2010

This evening

I will go out to Mina 1 Mai to meet there a roof contractor from Vulcan. He will inspect the building and hopefully we shall have a second quotation from him. I will get back to you later with more details.

05 May 2010

Results of today's visit

I went to Mina again in this lovely spring day, weather is very warm now. I saw that all the employees were working hard in cleaning around, so it was obvious that something will happen soon. I talked to the head nurse and she said that they are expecting Dr. Grigoriu on a visit. I spent there over an hour but the director did not arrived while I was there. Probably just later, or much later.

A few important things:
1. I have delivered there all the medical stuff that I bought for the dentist according to her list and left it in the dental surgery.
2. The head nurse said that she wanted to contact the contracter for the roof but that contracter has gone to Germany and he works there now. So that means that she will not give us a quotation from that person.
3. The carpenter was not there. He is in holiday and for quite a long while, till mid June. I could not made an inventory of our tools but I was told the following: The carpenter has now his yearly holiday and in July when the team is here he will be there and available. Also the carpenter now is only 59 years old (even he might look older) so he still has a few years left until he will retire - the head nurse told me.
4. The toilets from the downstairs have now floor tiles, and the former sewing room has finally turned into patients wards from 1st of May. Downstairs now there are 4+2+7 a total of 13 patients, but all of them better condition including Simon, Costica, John and others. John has actually painted 3 stars at the entry meaning that the accommodation there is 3 star one, unlike the other hospital wards. See some of the photos.


29 April 2010

Yesterday

I have purchased all the dental materials the dentist needs, according to her list. It was not cheap. Anyway I got it and next time I go to Mina 1 Mai I will deliver them.
I have contacted the roofing engineer whom we met in March. I asked him that we would like an offer from him presented on a paper an official document signed and stamped which I can give to the charity. He said that he will make this document next week.
Also I took a brush and with motor oil I brushed the bottom of the car especially the rusted bits all around as it is said that this oil helps that the rust may not spread as fast. I know I can not stop the rust but at least to slow it down. Also used the WD40 and sprayed at the lock and thge hinges.

26 April 2010

Vladimir's interview translated

With the translation of Vladimir's interview, completed the translations of the interviews Matt took in February. Hopefully Matt can use them for the benefit of the charity.

12 April 2010

Photos of the visit

The roof is bad! The workers have put vynil sheet on the top of the ceramic tiles, to prevent the rain destroy the building.
The toilet area has new concreting, and on the top they will lay the new floor tiles.
Here is the downstairs ward